Current secondary focus

Power turbines in Abuja

The second priority for Aqua Energy is to install micro 50KW turbines in the water-pipe network of Abuja. The first is being installed to showcase the solutions of Aqua Energy and partners.

The electricity from the KT50 will be bought on a long term contract by one government building in Abuja.

Technical data: KT50
Rated net head: HN = 1-6 m
Rated discharge: QA = 300-1500 l/s
Turbine output: PT = 2,5-60 kW
Generator output: PT = 1,8-50 kW
Turbine speed: 350-1000 min-1
Runaway speed: 1200-3200 min-1
Generator speed (50-60hz): 1500-1800 min-1

Back to projects

Development details

Type of development:
Opening and fitting of KT50 turbine onto water-pipe before closing.
Planned production:
Around 45KW.
Date of operating license:
Not needed for this type of equipment.
Date of contract with landowner:
Ready to be signed but complicated due to possible future privatization of water-board