Current secondary focus
Power turbines in Abuja
The second priority for Aqua Energy is to install micro 50KW turbines in the water-pipe network of Abuja. The first is being installed to showcase the solutions of Aqua Energy and partners.
The electricity from the KT50 will be bought on a long term contract by one government building in Abuja.
| Rated net head: | HN = 1-6 m |
| Rated discharge: | QA = 300-1500 l/s |
| Turbine output: | PT = 2,5-60 kW |
| Generator output: | PT = 1,8-50 kW |
| Turbine speed: | 350-1000 min-1 |
| Runaway speed: | 1200-3200 min-1 |
| Generator speed (50-60hz): | 1500-1800 min-1 |
Development details
- Type of development:
- Opening and fitting of KT50 turbine onto water-pipe before closing.
- Planned production:
- Around 45KW.
- Date of operating license:
- Not needed for this type of equipment.
- Date of contract with landowner:
- Ready to be signed but complicated due to possible future privatization of water-board