Current tertiary focus
North Nigeria river-system
The third priority for Aqua Energy is a river-system already built into dams in the North of Nigeria.
| Rated net head: | HN = 41 m |
| Rated discharge: | QA = 14 m3/s |
| Turbine output: | PT = 5079 kW |
| Rated speed: | n1 = 375 rpm |
| Runaway speed: | nD = 694 rpm |
| Runner outlet diameter: | D2 = 1382 mm |
| Permissible suction head: | hS = +2,5 m |
Development details
- Type of development:
- Penstock type, 2 ways falls into one power station this is a new technology so far only developed by our technical partners HydroEnergy Gmbh.
- Planned production:
- 2 * 2179kW = 4,36 MW at full capacity
- Date of operating license:
- Being obtained (3 months processing time)
- Date of contract with landowner:
- Ready to be signed